Project 1650 to 1340: 12/27/21

It’s been a while since I updated on our house. For a while, I was just ignoring it – living my life and forgetting that we had to down-size and move! A few weeks ago, we had our first big inspection after the “mechanicals” were installed (ducts, electrical, plumbing, etc.) but before the dry wall was hung.

We walked through with the construction manager who was straight forward and patient to answer all our questions. There were some disappointments such as no walk-in shower in the master bathroom. This wasn’t in the contract so it wasn’t a breech, but the one builder guy had said he’d TRY To get us one. Obviously, he couldn’t. Overall, everything was fine.

Tonight my daughter and I drove by to take a look: we have dry wall and texture on the walls and the laminate flooring is installed. Hard to see in the dark:

We took some measurements of the bedrooms and Anna tested out the size of her closet, which is 5’9″ ….. the same length as she is!

The brick and stones for the outside of the house have been delivered and are just waiting for the masons to do their job:

We were told we’d close around January 31st … maybe sooner. That’s getting REAL … real close! Yikes!

This entry was posted in house and tagged , , , . Bookmark the permalink.